AEUG Richmond Solar, LLC, is p...
AEUG Richmond Solar, LLC, is p...
AEUG Richmond Solar, LLC, is proposing to construct and operate a solar energy generation facility and related transmission line in Madison County, Kentucky (where the transmission line is operated by the transmission owner). The proposed Richmond Solar Project will be located within a project area of approximately 2,000 acres between Walker Park Rd and US Route 25. A public meeting to inform the community about the project and answer questions will take place on September 23, 2024, between 5 p.m. and 7 p.m. at the Richmond Arts Council, 399 West Water Street, Richmond, KY. The proposed solar project will consist of solar photovoltaic panels and the associated racking systems, electric equipment, project substation, transformer, utility switching station, and underground electrical connection lines. The power generated by the project will be connected to the electric transmission grid via the West Garrard 345 kV line. Anyone with questions about the September 23, 2024, public meeting or the Richmond Solar Project may request information by emailing Josh Zuckerman at JZuckerman@acciona.com or calling (847) 971-2334
AEUG Richmond Solar, LLC, is proposing to construct and operate a solar energy generation facility and related transmission line in Madison County, Kentucky (where the transmission line is operated by the transmission owner). The proposed Richmond Solar Project will be located within a project area of approximately 2,000 acres between Walker Park Rd and US Route 25. A public meeting to inform the community about the project and answer questions will take place on September 23, 2024, between 5 p.m. and 7 p.m. at the Richmond Arts Council, 399 West Water Street, Richmond, KY. The proposed solar project will consist of solar photovoltaic panels and the associated racking systems, electric equipment, project substation, transformer, utility switching station, and underground electrical connection lines. The power generated by the project will be connected to the electric transmission grid via the West Garrard 345 kV line. Anyone with questions about the September 23, 2024, public meeting or the Richmond Solar Project may request information by emailing Josh Zuckerman at JZuckerman@acciona.com or calling (847) 971-2334
Posted Online 71 weeks ago